HIVE DIGITAL TARGETS 35 EH/S IN 2026
Today @HIVEDigitalTech announced a definitive agreement to expand its hydroelectric-powered data center campus in Yguazú, Paraguay, adding 100 MW and bringing the site’s total renewable capacity to 400 MW.
Powered by the Itaipú Dam, this Phase 3 expansion is expected to elevate HIVE’s global Bitcoin mining capacity to 35 EH/s by 2026, solidifying its position as a leader in sustainable digital infrastructure.
Concurrently, through a strategic partnership with @Bell, $HIVE aims to increase its #HPC and #AI operations fivefold, integrating $BUZZ #HPC’s sovereign AI cloud infrastructure with @Bell national network, enabling secure, renewable-powered AI and blockchain computing across Canada and beyond.

58.54K
282
The content on this page is provided by third parties. Unless otherwise stated, OKX is not the author of the cited article(s) and does not claim any copyright in the materials. The content is provided for informational purposes only and does not represent the views of OKX. It is not intended to be an endorsement of any kind and should not be considered investment advice or a solicitation to buy or sell digital assets. To the extent generative AI is utilized to provide summaries or other information, such AI generated content may be inaccurate or inconsistent. Please read the linked article for more details and information. OKX is not responsible for content hosted on third party sites. Digital asset holdings, including stablecoins and NFTs, involve a high degree of risk and can fluctuate greatly. You should carefully consider whether trading or holding digital assets is suitable for you in light of your financial condition.